Energy Drive Reconstruction

PROJECT

Energy Drive Reconstruction (ST14-002 / TDA 7214052)

ENGINEER

City of Kilgore Engineering Department

CONTRACTOR

RVP Construction Inc. (Marshall, TX)

CONSTRUCTION COST

Original Contract - $1,322,977.00
Combined Change Orders  - $49,711.52
Excess Time Penalty - ($19,500.00)
Final Contract - $1,353,188.52

FUNDING SOURCE
Grant Funds - $750,000.00
General Fund - $301,594.26
KEDC - $301,594.26

PROJECT LOCATION

Energy Dr. just off of Hwy 259.

PROJECT SCHEDULE

October 2015 to July 2016

PROJECT DESCRIPTION

Remove 2" existing asphalt, curb and gutter and driveways as needed; regrade roadway and install 6" of jointed plain concrete pavement, curb and gutter and driveways.

JUSTIFICATION

Made possible largely by grant funds from the KEDC and the Texas Department of Agriculture and Texas Capital Fund, the City was able to upgrade the existing road cross-section to a new, more substantial cross section that will accommodate the heavy truck traffic in this industrial park.

PROJECT UPDATE

The roadway has been rebuilt, passed smoothness testing, and been striped.
The Energy Dr. Reconstruction project is now complete.